CONSTRUCTION SYSTEMS

DECORATIVE FACADE COATINGS BASED MINERAL

ADMIXTURE SYSTEMS

"İzoKontakt 2" cement-based fast setting repair and anchoring mortar

"İzoKontakt 2" cement-based fast setting repair and anchoring mortar

Product consumption calculator


Preorder


Print


Product description

Ready to application plugging plaster has been special composition of cement and sand, used in water soakage areas insulation, mounting and repair works, increasing adhesive force, fast expanding and setting when mixed with water.

Fields of Application

This repair and mounting mixture can be applied in the following areas:

  • indoor and outdoor areas;
  • floorings and walls;
  • repair of cracks which do not tend to grow ;
  • insulation of water soakage areas;
  • insulation of pipes;
  • repair of concrete surfaces;
  • strengthening iron cavities inside moulds;
  • oval shaping of concrete edges and corners, repair of joints;
  • fastening metal anchor bolts and elements.

Advantages

  • Monocomponent, to be mixed with water only;
  • Provides protection from water soakage due to fast setting;
  • Easy application;
  • Once expanded the product forms waterproofing layer;
  • Durable and stable;
  • Insulation materials can be applied in 15 minutes after the product application;
  • Does not contain chlorine, so does not cause corrosion of steel structures.
  • Suitable for reliable application in potable water reservoirs.

Application procedures

Preparation of the surfaces. The surfaces to be used should be healthy, rigid, clean, dust-free, and should have suitable dimensions. The surface should be totally free of any fat, rust, paraffin, and other substances deteriorating adhesive force, and should not have small splinters. Edges of cavities and cracks of 20 mm depth and width should be cut upright. The V-shape cavities with sharp cut corners are not allowed.

Preparation of the mixture. Pour the required amount of the product into a clean mixing container, and add the required amount of water within 3 minutes. Put on appropriate protective gloves and mix within maximum 30 seconds. Add 0.23 liter of pure water to 1 kg of the IzoKontakt 2 product and mix (amount of water may vary depending on the ambient temperature).

Application. The prepared mixture can be used in fastening operations. Holes for anchor elements should be filled with required amount of the IzoKontakt 2 product, and fastening element should be immediately placed into the hole in vertical position. Keep the IzoKontakt 2 product surface wet for 30 minutes.

Recommendations. In the cool weather conditions hot or warm water should be used. Any other chemical substances should not be added to the mixture. In case the ambient temperature in the area of IzoKontakt  2 application is below +50C and above +320C, then the required temperature should be provided. Due to quick separation of water during application, the product hardens quickly. So the treated surface should retain moisture for 15 minutes. For dry surfaces and surfaces with high water absorption ability this period should be 30 minutes.

Period of use and reaction rate of the specific cement based systems are sensitive to the ambient and surface temperatures and humidity at the moment  of application and reaction. Low temperature reduces the reaction rate and results in elongation of useful life of the prepared product in container and the operation period. High temperatures increase the reaction rate and result in decrease of above mentioned parameters. To save the product water content and to achieve maximum effectiveness the temperature should not drop below the recommended minimum values. To increase the period of the product use in cold weather conditions the packages should be brought to ready for application state at temperatures between +200C and +250C, and the mixture should be prepared using warm water only. After use all hand tools and devices should be cleaned with warm water. After hardening the IzoKontakt 2 product can be removed from the surface by mechanical means only.

Consumption

Differs depending on dimensions of water soaked areas.

Shelf Life and Storage Method

The product can be stored during 6 months from the manufacturing date packed in original sacks in dry and cold conditions, protected from freezing. Unpacked product should be used within one week.

Warnings

  • The IzoKontakt 2 product should be stored packed in original sacks in dry and cold conditions, protected from freezing;
  • Unpacked product should be used within one week;
  • when using the product wear appropriate protective clothing, safety gloves, glasses, and respirators;
  • immediately rinse with water in case of contact with skin or eyes; in case you swallow the product, consult a physician;
  • keep the product away from food and children;
  • parameters indicated above have been received on the basis of laboratory tests conducted in the ambient conditions of +230C±20C temperature and 50% + 5% humidity. Depending on the actual ambient conditions these parameters are subject to change.

Warranty and technical support

  • information indicated in technical specifications is based on scientific and experimental data;
  • Matanat А company is responsible for the product quality only;
  • with the exception of cases of works executed under the supervision of the company specialists, Мatanat  А company shall not be liable for any problems occuring due to improper use of the product by other persons;
  • the company reserves the right to make changes in its product in consequence of scientific-and-technical development;
  • for technical support and/or more information please do not hesitate to contact the Matanat А company!